国产全肉乱妇杂乱视频,久久日产一线二线三线品,无套内谢少妇毛片A片樱花,日本激情特黄三级激情视频

Home / Product

Product

Gas

Gas safety solenoid valve

Nominal pressure:Class150LB
Nominal diameter:DN15~150mm

EV and EV/6B solenoid valves are normally closed valves. They hold the valve open by means of electrically driven electromagnetic coils. These valves are designed to activate the valve to cut off the gas flow when the sensor detects a gas leak or an electrical interruption. These valves can be manually reset after the cause of emergency failure has been eliminated. In addition, in order to maintain a high level of safety, these valves can only be reset when the line is energized and the gas sensor does not detect any danger (a positive safety feature).


Working principle

These valves can only be manually reset in order to detect and eliminate the cause of the emergency. To simplify the reset operation, all EV/6B series valves and all flanged valves in the EV series are equipped with double RAMS to prevent the installation of a bypass system between the upstream and downstream solenoid valves in the pipeline. For double ram reset solenoid valves, the operating instructions attached to each package should be followed. For threaded EV series valves with only one ram, the aluminum handle mounted on the solenoid valve guide should be pulled to reverse position.


Installation matters

1. Never use the catheter as a balancing lever to install the valve.


2. Ensure that the pipe is straight and there are no obstacles or dust in the pipe.


3. The fluid direction should conform to the direction of the arrow printed on the valve body.


4. Check that all parameters, such as pressure, voltage, temperature, and other parameters, meet the requirements.


5. Avoid contact with plastered walls when installing valves.


6. Do not plug or block the handle guide rod, because this will affect the function of the valve.


7. Install an appropriate gas filter upstream of the valve.


8. If the solenoid valve is installed outside, it is usually recommended to protect it with atmospheric media.


9. The electrical connection of the coil must be operated by professionally qualified personnel and comply with mandatory regulations.


      <center id="vudui"></center>

      <center id="vudui"></center>

      • <u id="vudui"><listing id="vudui"><pre id="vudui"></pre></listing></u>
      • 主站蜘蛛池模板: 东源县| 久热在线这里只有精品7| 长海县| 苗栗市| 桂东县| 晋州市| 成全看免费观看完整版| 欧美国产日本高清不卡| 成全视频在线观看免费 | 盐城市| 亚洲无砖无线码| 青青国产揄拍视频| 性生交大片免费看A片苹果| 普洱| 漂亮老师做爰8| 汶川县| DY888午夜福利视频| 红安县| 噼里啪啦国语在线观看| 将军灬啊灬啊灬轻点野外| 摸BBB揉BBB揉BBB视频| 金昌市| 日产电影一区二区三区| 日本熟妇牲交视频| 精品国产精品人妻久久无码五月天| 大渡口区| 欧美同性男男性视频网站| 财经| 富锦市| 北碚区| 汝城县| 叶城县| 镇康县| 卫辉市| 鄂托克前旗| 大香伊蕉在人线国产最新75 | 日本变态sm无码凌虐视频| 日本高清道一区二区免费| 日韩大片B站免费观看直播| 新宁县| 陆丰市|